RG2 panels for offices in Czech Republic

Kingspan supplied 19,500m2 of RG2 panels to Prointerier who are fitting out Main Point, a 10 storey new office building under construction in Prague.

Although the finished floor height was very low and the concrete slabs were uneven, the 23mm thickness of the RG2 panels (compared to a standard conventional chipboard panel thickness of 38mm) helped to provide usable height for cables and other lines in the cavity.

Connecting the perimeter sections of the raised floor to the building’s fa├žade proved to be challenging for ProInterier because the building has many large and small radiuses of curves resulting from its kidney-like shape.

Due to be completed in the first quarter of 2012, Main Point will accommodate the Kooperativa and CPP insurance companies, which are both part of the Vienna Insurance Group.
 